Çanakkale Çan – 2 Thermal Power Plant Project PROJECT DETAILS Client: ODAŞ ENERJİ Location: ÇAN/ÇANAKKALE Scope: Boiler Main Steel Structure Erection- 2.000 Tons Secondary Steel Structure Erection- 3.000 Tons Start Date: 04.02.2016 WORK COMPLETION CERTIFICATES PROJECT GALLERY 123►