Project:MAREN SÖKE 55 MW Coal Fired Thermal Power Plant
Client:MAREN
Project Scope:All mechanical equipment installation and piping erection works of power plant
1-Installation Works of Boiler and Auxiliary Units
2-ESP & Bag House Filter Assembly Works
3-General Piping Works
4-Steam Turbine and equipment
Project Location:Söke-Aydın/TURKEY
Start Date:25.03.2019